• Navigator Manuals
  • Service
  • New
  • Top
  • Sitemap
Lincoln Navigator Manuals

Lincoln Navigator: Climate Control System - General Information / Reset the Outside Air Temperature Sensor Learned Values. General Procedures

Lincoln Navigator 2018-2026 Workshop Manual / Climate Control System / Climate Control System - General Information / Reset the Outside Air Temperature Sensor Learned Values. General Procedures

Configuration

  1. NOTE: The ambient air temperature sensor is a critical component for correct Air Conditioning (A/C) and Heating, Ventilation, and Air Conditioning (HVAC) system operation. Make sure after the reset is carried out the temperature is displaying correctly in the vehicle.

    NOTE: The outside air temperature sensor is also referred to as the ambient air temperature sensor in this manual.

    Using the diagnostic FDRS scan tool, follow the on screen prompts to run and reset the outside air temperature sensor learned values.

    Refrigerant System Tests - 3.5L EcoBoost (272kW/370PS). General Procedures

    Inspection NOTE: Procedure 1 — Ambient Temperature below 21 °C (70 °F). NOTE: To perform an accurate test make sure the vehicle ambient temperature is 21 °C (70 °F) or above...

    Air Conditioning (A/C) Clutch and Air Conditioning (A/C) Clutch Field Coil. Removal and Installation

    Special Tool(s) / General Equipment Snap Ring Pliers Removal NOTE: Removal steps in this procedure may contain installation details...

    Other information:

    Lincoln Navigator 2018-2026 Workshop Manual: Instrument Panel and Interior Switches Illumination - System Operation and Component Description. Description and Operation


    System Operation System Operation Overview - Dimmable Illumination Dimmable illumination provides backlighting to switches and control components when the parking lamps are on. The level of intensity for the dimmable backlit components is adjusted by using the instrument panel dimmer switch to increase or decrease intensity...

    Lincoln Navigator 2018-2026 Workshop Manual: Brake Pads. Removal and Installation


    Removal NOTE: Removal steps in this procedure may contain installation details. NOTE: 2WD shown, 4WD similar. Remove the wheel and tire. Refer to: Wheel and Tire (204-04A Wheels and Tires, Removal and Installation). NOTICE: Do not pry in the caliper sight hole to retract the pistons as this can damage the pistons and boots...

    Categories

    • Manuals Home
    • 4th Gen Lincoln Navigator Service Manual (2018 - 2026)
    • Telematics Control Unit (TCU) Module. Removal and Installation
    • Liftgate Trim Panel. Removal and Installation
    • Vehicle Dynamics Control Module (VDM). Removal and Installation
    • Front Seat. Removal and Installation
    • Identification Codes. Description and Operation

    Rear Camber Adjustment. General Procedures

    Special Tool(s) / General Equipment

    Wheel Alignment System

    Activation

    NOTICE: Suspension fasteners are critical parts that affect the performance of vital components and systems. Failure of these fasteners may result in major service expense. Use the same or equivalent parts if replacement is necessary. Do not use a replacement part of lesser quality or substitute design. Tighten fasteners as specified.

    Using alignment equipment and the manufacturer's instructions, measure the rear camber.
    Use the General Equipment: Wheel Alignment System

    read more

    Copyright © 2026 www.linavigator4.com